Opening Above Ground Pool PDF Print E-mail
PROCEDURE FOR OPENING ABOVE GROUND POOLS:

1. REMOVE ALL WATER OFF COVER WITH COVER PUMP.

2. REMOVE ALL LEAVES AND DEBRIS OFF COVER.

3. REMOVE COVER OFF POOL.

4. INSTALL ALL PLUGS IN EQUIPMENT THAT WERE REMOVED FOR WINTERIZATION.

5. REINSTALL EQUIPMENT IF REMOVED IN WINTER, REMOVE RETURN PLUGS AND REINSTALL RETURN OUTLETS

6. RAISE WATER LEVEL TO MIDWAY IN SKIMMER (IF SO EQUIPTED).

7. START PUMP, CHECK ALL CONNECTIONS FOR LEAKS.

8. CLEAN POOL OF DUST AND DEBRIS IF NEEDED.

9. TEST WATER OR BRING SAMPLE INTO STORE FOR TESTING.

10. ADJUST BALANCE AND SANITIZER LEVEL TO PROPER LEVEL, ADDING ALGAECIDE AND STAIN

PREVENTIVE IS RECOMMENDED FOR SPRING START-UP.
 

We use only the highest quality supplies for your pool!

Pentair  |  Zodiac  |  PolarisSta-Rite | RegalLoop Loc  |  Hayward  |  Aqua Products